51黑料-51黑料官方最快直通车

Page Options
>> >>view
Huangshali Grand Bridge expects main structure completion by Spring Festival
2026-01-08

Cranes and aerial platforms worked in tandem 30 meters above the Huangshali Waterway on January 6, dismantling steel supports on the main deck of the Huangshali Grand Bridge, a pivotal control project of Zhongshan's East Ring Expressway. 


0108-4.jpg


Construction has entered its final phase, with the main structure targeted for completion ahead of the 2026 Spring Festival.


Built in two phases, the 55.6-km East Ring Expressway links Foshan, Zhongshan and Zhuhai, with 6 hub interchanges and 9 service interchanges.


Phase 1 is set to open in August 2026, and upon full operation, East Ring Expressway will directly connect to the ShenZhong Link and integrate with the Nansha-Zhongshan and Zhongshan-Kaiping expressways to form a regional highway network.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us